Well the counter top is all stuck down and we are at about 40% on the back splash tile. We still need to do the other 60% of the back splash plus grout to complete the project. Chris and I are working as a team on this I do the layout, he does the cutting, and I apply the tile and then he will finish up with grout.
We pre-laid out all the tile but the first sink side got all discombobulated in the process of sticking the tiles down with the thin set so approximately 20 tiles had to be re-cut. The second side we only had to re-cut about 6 tiles so we did improve dramatically. Anyways on to the pics
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment