Friday night we went to Lowe's to pick up the tile, that was more painful than I anticipated however I still think that we are going to be happier with the end result than we would have if we have gone with formica. Of course they did not have enough of the bullnose tile for us so that is on order they gave us an estimate of a week to a week and a half. Of course that was really the component we needed to get things started. Oh well at least we had a pretty relaxing weekend.
I of course could not resist unboxing some of the countertop tiles and doing a test layout. I think it's going to be really nice.
I'm also hoping to order the light soon however before we get to that point we need to decide on a length. According to the resources I have found online for pendants over an island or peninsula you want them to be 72" of of the floor. Our ceiling is 7'5" which would give us 17" for overall fixture length. I didn't want the chain to be too short so I bumped that up to 18" and then as a test I hung a string from the ceiling 18" long. That looks about right to me. Chris is of average height so I had him stand on the inside of the counter top and look towards to door and it didn't seem to be in his face so I think that will work nicely. As someone who is on the short side I have absolutely no concept of these things.
You can also see in this picture that we have the pantry door remounted. I think it looks really good. If the tile gets in by next weekend we will be tiling. If not we'll be sanding the floor, either way fun for everyone.
Sunday, April 20, 2008
Monday, April 14, 2008
Cabinets, Part 2
It is now day 2 of the cabinet install. Looks like it's going to be a couple of hours again tomorrow. Although I wish that it were done it is somewhat gratifying to know that we're not the only ones that have trouble beating the old girl into submission.
Here are todays install shots. The rest of the base cabinets are installed, the counter top base is in, and the hood is installed. Troy also installed the knobs for us. True this is something we could have done ourselves but at this point we can use all the help we can get.
The sink was also installed today. The sink has always been an interesting design challenge. You see our sink is right next to the refrigerator which is less than ideal to begin with and then when you work in the semi custom realm of cabinets things don't always work out perfect so we had to choose would the sink be centered on the the cabinet or would it be centered on the window. We went for the window. Right now I'm having a little bit of self doubt about choosing the window but I am relatively confident that when the faucet is installed it will all come together.
I'm also going to have to work out some things as far as the tile. The sink ended up being a lot larger than I thought it would be leaving only a small area to tile to the left of the sink and on the front edge. I'm hoping that if I draw it up I'll be able to work out all of the kinks.
Here are todays install shots. The rest of the base cabinets are installed, the counter top base is in, and the hood is installed. Troy also installed the knobs for us. True this is something we could have done ourselves but at this point we can use all the help we can get.
The sink was also installed today. The sink has always been an interesting design challenge. You see our sink is right next to the refrigerator which is less than ideal to begin with and then when you work in the semi custom realm of cabinets things don't always work out perfect so we had to choose would the sink be centered on the the cabinet or would it be centered on the window. We went for the window. Right now I'm having a little bit of self doubt about choosing the window but I am relatively confident that when the faucet is installed it will all come together.
I'm also going to have to work out some things as far as the tile. The sink ended up being a lot larger than I thought it would be leaving only a small area to tile to the left of the sink and on the front edge. I'm hoping that if I draw it up I'll be able to work out all of the kinks.
Friday, April 11, 2008
Day 405 - We have Cabinets
After 405 days our Kitchen has Cabinets once again. The install isn't complete but it is an excellent start.
Here is what the kitchen looked like on our first tour of the house.
I certainly think it's an improvement. I'm excited to see what it will look like when it's finished. Troy will be back on Monday at 7:00 to finish up in addition to the cabinets he's going to install the base for the counter tops as well as the sink. Which will be very nice. I can't wait.
Here is what the kitchen looked like on our first tour of the house.
I certainly think it's an improvement. I'm excited to see what it will look like when it's finished. Troy will be back on Monday at 7:00 to finish up in addition to the cabinets he's going to install the base for the counter tops as well as the sink. Which will be very nice. I can't wait.
Wednesday, April 9, 2008
Looking Into the Past
Tuesday, April 8, 2008
Weekend Update - The Grand De Dusting
We had a successful weekend on the house we finally got the kitchen de-dusted and Chris did a very impressive job replicating the trim on the two windows that we added. I spent Sunday night shellacking the wood, a process I am not going to do again that dyed shellac is a total and complete pain in the ass to work with but I committed myself early in the process and at this point I just need it to match. I'm going to see how dying the polyurethane or using the dye to make an alcohol stain works with the pine in future projects I also want to tame the color a bit as it turned out a bit darker when brushed than I intended. Anyways on to the photos...