We are progressing on the bathroom but slowly. I finished stripping the built in and door frame and finished patching the walls. Chris drilled a new hole for the bathroom fan vent and ran the ducting to the outside. We've also decided to have the plumber back to replace all of the galvanized plumbing in the kitchen ceiling with PEX. We were originally going to do the install our selves but with this project dragging on so long we felt it was best to hire out.
So Tuesday when the plumber is here I'm hoping to try out the shellac mix on the good trim and get the unimpressive trim painted aiming to get the walls painted next weekend. It should be close but I'm hoping for the best.